All Issue

2018 Vol.17, Issue 4 Preview Page

Research Article

30 December 2018. pp. 129-139
Abstract
References
1
Amoun, S., Sharifzadeh, M., Shahriar, K., Rostami, J. and Azali, S. T. (2017), “Evaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansion”, Tunnelling and Underground Space Technology, Vol.61, January 2017, pp.233-246.
10.1016/j.tust.2016.11.001
2
Avunduk, E. and Copur, H. (2018), “Empirical modeling for predicting excavation performance of EPB TBM based on soil properties”, Tunnelling and Underground Space Technology, Vol.71, January 2018, pp.340-353.
10.1016/j.tust.2017.09.016
3
Bandini, A., Berry, P., Cormio, C., Colaiori, M. and Lisardi, A. (2017), “Safe excavation of large section tunnels with Earth Pressure Balance Tunnel Boring Machine in gassy rock masses: The Sparvo tunnel case study”, Tunnelling and Underground Space Technology, Vol.67, August 2017, pp.85-97.
10.1016/j.tust.2017.05.001
4
Copur, H., Aydin, H., Bilgin, N., Balci, C., Tumac, D. and Dayanc, C. (2014), “Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model”, Tunnelling and Underground Space Technology, Vol.42, May 2014, pp.1-14.
10.1016/j.tust.2014.01.006
5
Cundall, P. A. (1971), A computer model for simulating progressive, large scale movement in blocky rock systems, In Proceedings of the International Symposium on Rock Mechanics. Vol.2, pp.129-136.
6
Cundall, P. A. and Strack, O. D. (1979), A discrete numerical model for granular assemblies, geotechnique, Vol.29, No.1, pp.47-65.
7
Gharahbagh, E. A., Mooney, M. A., Frank, G., Walter, B. and Di Ponio, M. A. (2013), “Periodic inspection of gauge cutter wear on EPB TBMs using cone penetration testing”, Tunnelling and Underground Space Technology, Vol.38, September 2013, pp.279-286.
10.1016/j.tust.2013.07.013
8
Herrenknecht. (2008), EPB Shield. Fast tunnelling technology with a broad application range, Herrenknecht, Germany.
9
ITA, W. (2000), Mechanized Tunnelling: Recommendations and Guidelines for Tunnel Boring Machines (TBMs), Publication No. MAI 2001 - ISSN 1267-8422, International Tunnelling Association, Lausane, Switzerland.
10
KICT. (2015), Development of optimized TBM cutterhead design method and high-performance disc cutter, Publication No. ISBN 979-11-954377-2-6, Korea Agency for Infrastructure Technology Advancement, Anyang-si, Republic of Korea. (in Korean)
11
Lee, C., Chang, S. H., Choi, S. W., Park, B., Kang, T. H. and Sim, J. K. (2017a), Preliminary study on a spoke-type EPB shield TBM by discrete element method, Journal of Korean Tunnelling and Underground Space Association, Vol.19, No.6, pp.1029-1044. (in Korean)
12
Lee, C., Chang, S. H., Choi, S. W., Park, B., Kang, T. H. and Sim, J. K. (2017b), Numerical Study of Face Plate-Type EPB Shield TBM by Discrete Element Method, Journal of the Korean Geosynthetics Society, Vol.16, No.4, pp.163-176. (in Korean)
13
Shi, H., Yang, H., Gong, G. and Wang, L. (2011), Determination of the cutterhead torque for EPB shield tunneling machine. Automation in Construction, Vol.20, No.8, pp.1087-1095.
10.1016/j.autcon.2011.04.010
14
Maidl, U. and Comulada, M. (2011), “Prediction of EPB shield performance in soils”, Proc. of the In Rapid Excavation and Tunneling Conference, January 2011, pp.1083-1091.
15
Maynar, M. J. and Rodríguez, L. E. (2005), “Discrete numerical model for analysis of earth pressure balance tunnel excavation”, Journal of Geotechnical and Geoenvironmental Engineering, Vol.131, No.10, pp.1234-1242.
10.1061/(ASCE)1090-0241(2005)131:10(1234)
16
Peng, B. (2014), Discrete element method (DEM) contact models applied to pavement simulation, Ph.D Thesis, Virginia Polytechnic Institute and State University, pp.19-23.
17
Peila, D., Picchio, A. and Chieregato, A. (2013), “Earth pressure balance tunnelling in rock masses: Laboratory feasibility study of the conditioning process”, Tunnelling and Underground Space Technology, Vol.35, April 2013, pp.55-66.
10.1016/j.tust.2012.11.006
18
Ucgul, M., Fielke, J. M. and Saunders, C. (2014), Three-dimensional discrete element modelling of tillage: Determination of a suitable contact model and parameters for a cohesionless soil, Biosystems Engineering, Vol.121, May 2014, pp.105-117.
10.1016/j.biosystemseng.2014.02.005
19
Wassgren, C. and Sarkar, A. (2008), “PSL DEM Lecture 06: Introduction to Soft-Particle DEM and Normal Contact Force Models - Part I.
20
Wu, L., Guan, T. and Lei, L. (2013), “Discrete element model for performance analysis of cutterhead excavation system of EPB machine”, Tunnelling and Underground Space Technology, Vol.37, August 2013, pp.37-44.
10.1016/j.tust.2013.03.003
21
Wu, L. and Liu, C. (2014), “Modeling of shield machine tunneling experiment by discrete element method”, Applied Mechanics and Materials, Vols.556-562, pp.1200-1204.
10.4028/www.scientific.net/AMM.556-562.1200
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 17
  • No :4
  • Pages :129-139
  • Received Date : 2018-11-11
  • Revised Date : 2018-11-27
  • Accepted Date : 2018-12-03