Abstract
References
1.Bhang, I. H. (2007) “A Study on the technology related to the control and rehabilitation of slope surface erosion”, Master Thesis, Chonbuk National University. 2.Christopher, B. R., Gill, S. A., Giroud, J. P., Juran, I., Nitchell, J. K., Schlosser, F. and Dunnicliff, J. (1990) “Reinforced Soil Structures Volume Ⅰ. Design and Construction Guidelines and Reinforced Soil Structures Volume Ⅱ. Summery of Research and System Information”, Federal Highway Admini-stration. FHWA-RD-89-043., Washington, D.C., Vol.1, 283p., Vol.2. 158p. 3.Han, J. G., Kim, J. S., Hong, K. K., Cho, S. D., and Cho, G. S. (2006) “Behavior of the tired-reinforced soil walls having the high embanked slope”, The Fall 2006 Geosynthetics Conference, pp.115-120. 4.Kim, Y. M. (2008), “The Study of Numerical Analysis on Failure Behavior of Reinforced Soil Wall”, Journal of Korean Geosynthetics Society, Vol.7, No.3 pp.9-16. 5.Kim, Y. S., Kim, J. H., Bhang, I. H., and Seo, S. G. (2013) “A Study Rainfall-induced Erosion of Land Surface on Reinforced Slope Using Soil Improvement Material”, Journal of the Korean Geotechnical Society, Vol.29, No.1, pp.49-59.
Information
- Publisher :Korean Geosythetics Society
- Publisher(Ko) :한국지반신소재학회
- Journal Title :Journal of the Korean Geosynthetics Society
- Journal Title(Ko) :한국지반신소재학회 논문집
- Volume : 12
- No :4
- Pages :35-44
- Received Date : 2013-09-17
- Revised Date : 2013-11-29
- Accepted Date : 2013-12-03
- DOI :https://doi.org/10.12814/jkgss.2013.12.4.035


Journal of the Korean Geosynthetics Society







