Abstract
References
Jung, H., Kim, H., Chun, B. (2009), “A study on the ground settlement and reinforcement measures in the case of tunneling at the yangsan fault.” Journal of the Korean Geotechnical society, Vol.10, No.6, pp.35-48. Lee, G.-Y., Oh, J.-H., Cho, K.-H., and Lee, D.-S. (2016), “A case study on elephant foot method for railway tunneling in large fault zone.”, Journal of the Korean society of civil engineers, Vol.36, No.6, pp.1161-1167. Lee, G.-Y. (2016). A case study on elephant foot method for tunneling in large fault zone. Ms. Thesis, Korea National University of Transportation. Park, C., Lee, H., Park, J., Yoon, C., Hwang, J. (2009), “A Case study on elephant foot method for tunneling in the soft ground.” Journal of the Korean Geotechnical Society, September 25~26, 2009, Incheon, Korea. Shin, H. (2014). A study for tunneling excavation and re-inforcement in excessive displacement ground characteristics. Ms. Thesis, Woosong University.
Information
- Publisher :Korean Geosythetics Society
- Publisher(Ko) :한국지반신소재학회
- Journal Title :Journal of the Korean Geosynthetics Society
- Journal Title(Ko) :한국지반신소재학회 논문집
- Volume : 17
- No :1
- Pages :111-118
- Received Date : 2018-01-15
- Revised Date : 2018-03-16
- Accepted Date : 2018-03-21
- DOI :https://doi.org/10.12814/jkgss.2018.17.1.111


Journal of the Korean Geosynthetics Society







