All Issue

2018 Vol.17, Issue 1 Preview Page
30 March 2018. pp. 111-118
Abstract
References
1
Jung, H., Kim, H., Chun, B. (2009), “A study on the ground settlement and reinforcement measures in the case of tunneling at the yangsan fault.” Journal of the Korean Geotechnical society, Vol.10, No.6, pp.35-48.
2
Lee, G.-Y., Oh, J.-H., Cho, K.-H., and Lee, D.-S. (2016), “A case study on elephant foot method for railway tunneling in large fault zone.”, Journal of the Korean society of civil engineers, Vol.36, No.6, pp.1161-1167.
3
Lee, G.-Y. (2016). A case study on elephant foot method for tunneling in large fault zone. Ms. Thesis, Korea National University of Transportation.
4
Park, C., Lee, H., Park, J., Yoon, C., Hwang, J. (2009), “A Case study on elephant foot method for tunneling in the soft ground.” Journal of the Korean Geotechnical Society, September 25~26, 2009, Incheon, Korea.
5
Shin, H. (2014). A study for tunneling excavation and re-inforcement in excessive displacement ground characteristics. Ms. Thesis, Woosong University.
6
Yim, C. (2006), Optimum tunnel excavation and reinforcement method in large fault zones. Ms. Thesis, Korea University.
7
Yim, S., Seo, Y., Kim K., Kim C., Kim H. (2010), “Reinforcing Effect by Tunnel Support System.” KSEG Conference, April 8-9, 2010, Kyeongju, Korea, pp.255-258.
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 17
  • No :1
  • Pages :111-118
  • Received Date : 2018-01-15
  • Revised Date : 2018-03-16
  • Accepted Date : 2018-03-21