All Issue

2016 Vol.15, Issue 1 Preview Page
30 March 2016. pp. 59-70
Abstract
References
1
1.Alphonse, J. D. (1999), Value Engineering: Practical Applications for Design, Construction, Maintenance & Operations, Kingston ; R.S. Means Company, pp.231-244.
2
2.Arratia,B.A. (1998), A FAST-Driven Approach to New Pro-duction Planning, SAVE International Annual Conference Proceedings, pp.247-264.
3
3.Caltrans (1999), Value Analysis Report Guide, USA, pp.146-188.
4
4.Kelly, J. and Male, S. (2001), A Quick Approach to Task FAST Diagrams, SAVE International Annual Conference Pro-ceedings, pp.261-270.
5
5.KICT (2000), A study on substantial operational techniques of construction VE, pp.86-90.
6
6.Saaty, T. (1980), The Analytic Hierarchy Process, New York ; McGraw-Hill, pp.78-92.
7
7.Warwick, T. (1994), Function Analysis for Team Problem Solving, SAVE International Annual Conference Proceedings, pp.127-132.
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 15
  • No :1
  • Pages :59-70
  • Received Date : 2015-01-21
  • Revised Date : 2016-03-24
  • Accepted Date : 2016-03-25