All Issue

2026 Vol.25, Issue 3 Preview Page

Research Article

30 September 2026. pp. 65-77
Abstract
References
1

Avunduk, E., Tumac, D. and Atalay, A. K. (2014), “Prediction of roadheader performance by artificial neural network”, Tunnelling and Underground Space Technology, Vol.44, pp.3-9.

10.1016/j.tust.2014.07.003
2

Basarir, H. and Karpuz, C. (2004), “A rippability classification system for marls in lignite mines”, Engineering Geology, Vol.74, No.3-4, pp.303-318.

10.1016/j.enggeo.2004.04.004
3

Bilgin, N., Dincer, T., Copur, H. and Erdogan, M. (2004), “Some geological and geotechnical factors affecting the performance of a roadheader in an inclined tunnel”, Tunnelling and Underground Space Technology, Vol.19, No.6, pp.629-636.

10.1016/j.tust.2004.04.004
4

Choi, Y. H. and Lee, S. S. (2021), “Predictive Modelling for Blasting-Induced Vibrations from Open-Pit Excavations”, Applied Sciences, Vol.11, No.16, 7487.

10.3390/app11167487
5

Hartlieb, P. and Bock, S. (2018), “Theoretical Investigations on the Influence of Artificially Altered Rock Mass Properties on Mechanical Excavation”, Rock Mechanics and Rock Engineering, Vol.51, No.3, pp.801-809.

10.1007/s00603-017-1355-3
6

Ismael, M., Abdelghafar, K., Sholqamy, M. and Elkarmoty, M. (2021), “Performance prediction of hydraulic breakers in excavation of a rock mass”, The Mining-Geology-Petroleum Engineering Bulletin, Vol.36, No.4, pp.107-119.

10.17794/rgn.2021.4.9
7

Kim, D. J., Park, H. J., Oh, J. Y., Cho, J. W., Chung, J. T. and Song, C. H. (2023), “Estimation of Impact Loads Transmitted to Vibro-Ripper Housing Using Transfer Path Analysis”, Applied Sciences, Vol.13, No.19, 10990.

10.3390/app131910990
8

Kim, M. and Lee, C. (2025), “A Study on the Predictive Model for Estimating the Productivity of Vibratory Rippers Based on Rock Strength”, Journal of the Korean Geosynthetics Society, Vol.24, No.4, pp.41-51.

10.12814/JKGSS.2025.24.4.041
9

Oh, K. K., Kim, J. H., Kim, Y. W., Park, J. Y., Yang, G. S., Park, J. W. and Kim, S. H. (2014), “Fatigue Characteristics on Welded Joint of Gear Box-Shank in Vibro Ripper for Rock Crash”, Journal of the Korean Society of Safety, Vol.29, No.6, pp.28-33.

10.14346/JKOSOS.2014.29.6.028
10

Oh, K. K., Kim, J. H., Park, J. Y., Yang, G. S., Park, J. W. and Kim, S. H. (2015), “Evaluation of Fatigue Life of Welded Joint of Gear Box-Shank in Vibro Ripper Using P-S-N Curve”, Transactions of the KSME, A, Vol.39, No.12, pp.1207-1212.

10.3795/KSME-A.2015.39.12.1207
11

Palmstrom, A. (2005), “Measurements of and correlations between block size and rock quality designation (RQD)”, Tunnelling and Underground Space Technology, Vol.20, No.4, pp.362-377.

10.1016/j.tust.2005.01.005
12

Rodríguez, R. and Bascompta, M. (2020), “Vibration Analysis and Empirical Law Definition for Different Equipment in a Civil Construction”, Applied Sciences, Vol.10, No.14, 4689.

10.3390/app10144689
13

Singh, P. K., Roy, M. P., Paswan, R. K., Sarim, M., Kumar, S. and Jha, R. R. (2016), “Rock fragmentation control in opencast blasting”, Journal of Rock Mechanics and Geotechnical Engineering, Vol.8, No.2, pp.225-237.

10.1016/j.jrmge.2015.10.005
14

Toraño, J., Rodríguez, R., Diego, I. and Menéndez, M. (2006), “Environmental impact of rock excavation in urban areas: comparison between blasting and hydraulic breaker hammer”, Civil Engineering and Environmental Systems, Vol.23, No.2, pp.117-126.

10.1080/00207720600747442
15

Won, Y. H. and Kang, C. W. (2010), “Application of Rock Splitter to Rock Excavation in an Open pit”, Explosives & Blasting, Vol.28, No.1, pp.63-70.

Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 25
  • No :3
  • Pages :65-77
  • Received Date : 2026-09-09
  • Revised Date : 2026-09-15
  • Accepted Date : 2026-09-15