All Issue

2014 Vol.13, Issue 3 Preview Page
30 September 2014. pp. 39-47
Abstract
References
1
1.Choi C.Y., Lee S.H., Eum K.Y. (2010), “A comparison of behavior of the roadbed of ballasted & Concrete track with Cyclic loading, Journal of the Korean Geosynthetics Society, Vol.9, Issue.3, 2010, pp.1-8.
2
2.Eisenmann J., Leykauf G., (2000), “Feste Fahrbahn Fur Schienenhahnen” Sonderdruck aus, Beton Kalender.
3
3.Eisenmann J., Leykauf G., (2001), “Beton-Fahrbahnen”, 2nd Edition, Ernst&Sohn a Wiley Company.
4
4.Korea Railroad Research Institute (2011), Study on design standards of track system for the HSR at 400km/h, R&D/ 10PRTD-B056522-01.
5
5.Korea Rail Network authority (2008), A study on performance improvement of Interface for concrete track(Final report), 102 611H09-501-001.
6
6.Selig, E.T. and Waters, J.M. (1996), Track Geotechnology and Substructure Management, Telford, England.
7
7.PCA (1984), Thickness Design for Concrete Highway and Street Pavement, Portland Cement Association.
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 13
  • No :3
  • Pages :39-47
  • Received Date : 2014-05-09
  • Revised Date : 2014-09-11
  • Accepted Date : 2014-09-18