All Issue

2013 Vol.12, Issue 1 Preview Page
30 March 2013. pp. 73-81
Abstract
References
1
1.Arbeitsgemeinschaft für Fernwärme e.V. (1991), The Plastics which It uses from District Heating-The Combination PE Tube, Korea District Heating Corporation.
2
2.Kim, J. H. (2004), “The Relief Method of Thermal Stress induced by Temperature Change of District Heating Water in underground Pre-insulated Pipe”, The Society of Air-Conditioning and Refrigerating Engineers of Korea, Vol.2004, pp.224.
3
3.Kim, J. Y., Kim, H. B., Ko, H, I., An, Y. M., Cho, C. D. (2009), “Design Validation and Improvement of District Heating Pipe Using FE Simulation”, The Korean Society of Mechanical Engineers, Vol.33, No.4, pp.337-345.
4
4.Kim, J. Y. (2011) A Study on the Reinforced Bends with Transverse Load Carrying Capacity for Pre-Insulated Bonded Pipes in District Heating, Ph.D. Thesis, Inha University Graduate school.
5
5.Lee, H., Kim, Y. H. (1999), “District Heating Networks Main-tenance”, The Society of Air-Conditioning and Refrigerating Engineers of Korea, Vol.1999, pp.59-77.
6
6.Namkoong, C. K., Shin, B. K. (2003) “A Study on the Power of Friction on the Underground Piping for the District Heating”, Korean Society of Machine Tool Engineers, Vol.2003, pp.68-72.
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 12
  • No :1
  • Pages :73-81
  • Received Date : 2013-03-12
  • Revised Date : 2013-03-25
  • Accepted Date : 2013-03-25