All Issue

2025 Vol.24, Issue 4 Preview Page

Research Article

30 December 2025. pp. 41-51
Abstract
References
1

AMI Attachment Inc. (2025), Rock Ripper, https://www.amiattachments.com/product/rock-ripper-tooth/

2

Amin, M. M., Huei, C. S., Hamid, Z. A. and Ghani, M. K. (2009), “Rippability assessment of rock based on specific energy and production rate”, Proc. of the 2nd Construction Industry Research Achievement International Conference (CIRAIC 2009).

3

Barton, N., Lien, R. and Lunde, J. (1974), “Engineering classification of rock masses for the design of tunnel support”, Rock Mechanics, Vol.6, No.4, pp. 189-236.

10.1007/BF01239496
4

Basarir, H. and Karpuz, C. (2004), “A rippability classification system for marls in lignite mines”, Journal of Engineering Geology, Vol.74, No.3, pp.303-318.

10.1016/j.enggeo.2004.04.004
5

Bilgin, N. Seyrek, T., Erdinç, E. and Shahriar, K. (1990), “Roadheaders glean valuable tips for Istanbul Metro”, Tunnels and Tunneling, Vol.22, No.10, pp.29-32

6

Bilgin, N., Seyrek, T. and Shahriar, K. (1988), “Roadheader performance in Istanbul, Golden Horn clean-up contributes valuable data”, Tunnels and Tunneling, Vol.20, No.6, pp.41-44.

7

Bilgin, N., Yazici, S. and S. Eskikaya. (1996), “A Model to Predict the Performance of Roadheaders and Impact Hammers In Tunnel Drivages,” ISRM International Symposium – EUROCK 96, Turin, Italy, September 1996.

8

Caterpillar Inc. (2000), Handbook of Ripping, 12th Edition, Caterpillar Inc., Peoria, Illinois.

9

Kim, D. J., Park, H. J., OH, J. Y., Cho, J. W., Chung, J. T. and Song, C. H. (2023), “Estimation of Impact Loads Transmitted to Vibro-ripper Housing Using Transfer Path Analysis”, Applied Sciences, Vol.13, No.19.

10.3390/app131910990
10

Liu, Z., Yang, G. and Cao, G. (2016), “Research Status and Prospects of Vibro Ripper”, IOSR Journal of Engineering, Vol.6, No.8, pp.60-65.

10.9790/3021-068026065
11

MacGregor, F. (1993), “The rippability of rock”, PhD Thesis, University of New South Wales, Sydney.

12

Maximum Equipment. (n.d.), https://maximum-equipment.com/

13

Ocak, I. and Bilgin, N. (2010), “Comparative Studies on the performance of a roadheader, impact hammer and drilling and blasting method in the excavation of metro station munnels in Istanbul”, Tunnelling and Underground Space Technology, Vol.25, No.2, pp.181-187.

10.1016/j.tust.2009.11.002
14

Sujiman, S. (2018), “Evaluation of Ripper Productivity (Caterpillar D8R) Based on Strengthness of Rock at PT Kitadin Embalut Site Tenggarong Subdistrict Kutai Kartanegara East Kalimantan Province”, International Journal of Accounting, Finance, and Economics.

15

Zhang, L. (2016), “Determination and applications of rock quality designation (RQD)”, Journal of Rock Mechanics and Geotechnical Engineering, Vol.8, No.3, pp.389-397.

10.1016/j.jrmge.2015.11.008
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 24
  • No :4
  • Pages :41-51
  • Received Date : 2025-10-27
  • Revised Date : 2025-11-20
  • Accepted Date : 2025-11-27