All Issue

2017 Vol.16, Issue 4 Preview Page
30 December 2017. pp. 163-176
Abstract
References
1
Amoun, S., Sharifzadeh, M., Shahriar, K., Rostami, J. and Azali, S. T. (2017), “Evaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansion”, Tunnelling and Under-ground Space Technology, Vol.61, January 2017, pp.233-246.
2
Avunduk, E. and Copur, H. (2018), “Empirical modeling for predicting excavation performance of EPB TBM based on soil properties”, Tunnelling and Underground Space Technology, Vol.71, January 2018, pp.340-353.
3
Bandini, A., Berry, P., Cormio, C., Colaiori, M. and Lisardi, A. (2017), “Safe excavation of large section tunnels with Earth Pressure Balance Tunnel Boring Machine in gassy rock masses: The Sparvo tunnel case study”, Tunnelling and Under-ground Space Technology, Vol.67, August 2017, pp.85-97.
4
Cleveland, W. S. (1979), “Robust locally weighted regression and smoothing scatterplots”, Journal of the American Statistical Association, Vol.74, No.368, pp.829-836.
5
Copur, H., Aydin, H., Bilgin, N., Balci, C., Tumac, D. and Dayanc, C. (2014), “Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model”, Tunnelling and Underground Space Technology, Vol.42, May 2014, pp.1-14.
6
Culi, L., Pujades, E., Vázquez-Suñé, E. and Jurado, A. (2016), “Modelling of the EPB TBM shield tunnelling advance as a tool for geological characterization”, Tunnelling and Under-ground Space Technology, Vol.56, June 2016, pp.12-21.
7
Cundall, P. A. and Strack, O. D. (1979), “A discrete numerical model for granular assemblies”, Geotechnique, Vol.29, No.1, pp.47-65.
8
Di Maio, F. P. and Di Renzo, A. (2005), “Modelling particle contacts in distinct element simulations: linear and non-linear approach”, Chemical Engineering Research and Design, Vol.83, No.11, pp.1287-1297.
9
Di Renzo, A. and Di Maio, F. P. (2004), “Comparison of contact-force models for the simulation of collisions in DEM-based granular flow codes”, Chemical Engineering Science, Vol.59, No.3, pp.525-541.
10
Di Renzo, A. and Di Maio, F. P. (2005), “An improved integral non-linear model for the contact of particles in distinct element simulations”, Chemical Engineering Science, Vol.60, No.5, March 2005, pp.1303-1312.
11
EDEM. (2017), Generic EDEM Material Model (GEMM) Database, EDEM solution, Edinburgh.
12
Gharahbagh, E. A., Mooney, M. A., Frank, G., Walter, B. and Di Ponio, M. A. (2013), “Periodic inspection of gauge cutter wear on EPB TBMs using cone penetration testing”, Tunnelling and Underground Space Technology, Vol.38, September 2013, pp.279-286.
13
Hertz, H. (1882), “Über die Berührung fester elastischer Körper”, Journal für die reine und angewandte Mathematik, Vol.92, No.1881, pp.156-171.
14
ITA, W. (2000), Mechanized Tunnelling: Recommendations and Guidelines for Tunnel Boring Machines (TBMs), Publication No. MAI 2001 - ISSN 1267-8422, International Tunnelling Association, Lausane, Switzerland.
15
KICT. (2015), Development of optimized TBM cutterhead design method and high-performance disc cutter, Publication No. ISBN 979-11-954377-2-6, Korea Agency for Infrastructure Technology Advancement,  Anyang-si, Republic of Korea.
16
Maidl, U. and Comulada, M. (2011), “Prediction of EPB shield performance in soils”, Proc. of the In Rapid Excavation and Tunneling Conference, January 2011, pp.1083-1091.
17
Maynar, M. J. and Rodríguez, L. E. (2005), “Discrete numerical model for analysis of earth pressure balance tunnel excavation”, Journal of Geotechnical and Geoenvironmental Engineering, Vol.131, No.10, pp.1234-1242.
18
Mindlin, R. D. (1949), “Compliance of elastic bodies in contact”, Journal of Applied Mechanics, Vol.16,  pp.259-268.
19
Mindlin, R. D. and Deresiewicz, H. (1953), “Elastic spheres in contact under varying oblique forces”, Journal of Applied Mechanics, Vol.20, pp.327-344.
20
Mori, L., Alavi, E., Hagan, B. and Di Ponio, M. A. (2017), “Wear of Cutting Tools on an EPB TBM Tunneling Through Glacial Soils”, Proc. of the In Rapid Excavation and Tunneling Conference, San Diego, pp.25-36.
21
Peila, D., Picchio, A. and Chieregato, A. (2013), “Earth pressure balance tunnelling in rock masses: Laboratory feasibility study of the conditioning process”, Tunnelling and Underground Space Technology, Vol.35, April 2013, pp.55-66.
22
Peng, B. (2014), Discrete element method (DEM) contact models applied to pavement simulation, Ph.D Thesis, Virginia Polytechnic Institute and State University, pp.19-23.
23
Sakaguchi, H., Ozaki, E. and Igarashi, T. (1993), “Plugging of the flow of granular materials during the discharge from a silo”, International Journal of Modern Physics B, Vol.7, No.09n10, pp.1949-1963.
24
Tsuji, Y., Tanaka, T. and Ishida, T. (1992), “Lagrangian numerical simulation of plug flow of cohesionless particles in a horizontal pipe”, Powder Technology, Vol.71, No.3, pp.239-250.
25
Wu, L. and Liu, C. (2014), “Modeling of shield machine tunneling experiment by discrete element method”, Applied Mechanics and Materials, Vols.556-562, pp.1200-1204.
26
Wu, L., Guan, T. and Lei, L. (2013), “Discrete element model for performance analysis of cutterhead excavation system of EPB machine”, Tunnelling and Underground Space Technology, Vol.37, August 2013, pp.37-44.
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 16
  • No :4
  • Pages :163-176
  • Received Date : 2017-11-19
  • Revised Date : 2017-12-14
  • Accepted Date : 2017-12-18