All Issue

2024 Vol.23, Issue 4 Preview Page

Research Article

31 December 2024. pp. 89-98
Abstract
References
1

Elbeltagi, E., Hosny, O., Dawood, M. and Elhakeem, A. (2014), "BIM-Based Cost Estimation Monitoring For Building Construction", Journal of Engineering Research and Applications, Vol.4, pp.56-66.

2

Gunaydin, H. M. and Dogan, S. Z. (2004), "A Neural Network Approach for Early Cost Estimation of Structural Systems of Buildings", International Journal of Project Management, Vol.22, No.7, pp.595-602.

10.1016/j.ijproman.2004.04.002
3

Han, H. D., Kim, J. H., Yoon, J. H. and Seo, J. W. (2011), "Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network", Journal of Construction Engineering and Management, Vol.138, No.9, pp.679-687.

10.1061/(ASCE)CO.1943-7862.0000479
4

Hwang, M. G. (2005), "Application of Artificial Neural Networks to Soil Flushing Method", Master Thesis, MyongJi University.

5

Lee, S. C. (2011), "A Study on Constrction Cost Estimation of Apartment Buildings Using Particle Swarm Optimization", Journal of the Architectural Institute of Korea, Vol.13, No.2, pp.233-240.

6

Ministry of Land, Infrastructure anc Transport (2013), Road Business Manual.

7

Oh, J. H., Bae, S. M. and Nam, Y. J. (2022), "Development of a Electrical Performance Predicition Model for a Photovoltaic-thermal System Using an Artificial Neural Network", Korean Journal of Air-Conditioning and Refrigeration Engineering, Vol.34, No.4, pp.155-162.

10.6110/KJACR.2022.34.4.155
8

Park, J. Y. (2011), "The Cost Prediction Model of Road Type at the Planning Stage in Jeju", Master Thesis, Jeju National University.

9

Park, M. S., Sung, K. H., Lee, H. S., Ji, S. H. and Kim, S. Y. (2010), "Schmatic Cost Estimation Method using Case-Based Reasoning:Focusing on Determining Attribute Weight", Korean Journal of Construction Engineering and Management, Vol.11, No.4, pp.22-31.

10.6106/KJCEM.2010.11.4.22
10

Petroutsatou, K., Georgopoulos, E., Lambropoulos, S. and Pantouvakis, J. P. (2012), "Early Cost Estimation of Road Tunnel Construction Using Neural Networks", Tunnelling and Underground Space Technology, Vol.111

10.1061/(ASCE)CO.1943-7862.0000479
Information
  • Publisher :Korean Geosythetics Society
  • Publisher(Ko) :한국지반신소재학회
  • Journal Title :Journal of the Korean Geosynthetics Society
  • Journal Title(Ko) :한국지반신소재학회 논문집
  • Volume : 23
  • No :4
  • Pages :89-98
  • Received Date : 2024-11-07
  • Revised Date : 2024-12-16
  • Accepted Date : 2024-12-19